Dissertation: Zulässigkeit von Baukostenzuschüssen im Stromnetz oberhalb der Niederspannungsebene

Zulässigkeit von Baukostenzuschüssen im Stromnetz oberhalb der Niederspannungsebene

Buch beschaffeneBook-Anfrage

Schriften zum Energierecht, volume 6

Hamburg , 156 pages

ISBN 978-3-8300-8230-9 (print) |ISBN 978-3-339-08230-5 (eBook)

About this book deutschenglish

Electricity networks are essential to the provision of electrical power to businesses and individuals. In particular for manufacturing businesses a connection to the grid above the low-voltage level is often useful.

Network operators demand a subsidy for the new connection and for the change to a higher network level under the auspices of construction cost.

The power network market above the low-voltage level is a natural monopoly. This leaves consumers looking for a connection to the power grid with no possibility to select among different network operators.

Construction cost subsidies are not regulated by law above the low voltage level. The lack of legal regulation and the natural monopoly above the low-voltage level affect the balance of power between network operators and system users.

The lawfulness of the construction cost subsidies, the prerequisites for their demand and a review of the calculation models (Leistungspreismodell, 2-Ebenen-Modell) as well as a proposal for a reform of this system form the subject of this work.